After the Thirty-Ninth Day

September 22, 2000

The tile man has been working all week on the job.  The floor is now completely installed and he has started on the bathroom.  The first picture shows the inside of the bathroom; there is only a little left to complete.


This picture is of the top row of bullnose tiles in the bathroom.

The floor tile is done, and this next picture shows the grout; it is a medium-dark gray.

The plumber has also come back.  The sink has been physically installed, but not yet hooked up.

A little more plumbing was needed.  The cast iron pipe in this picture stuck out enough that it would have come past the cabinet.  We would have needed to put a soffet in that stuck out several inches from the cabinet.

So, as you can see in the following picture, it has been replaced with PVC pipe and angled in such a way so that the soffet will not need to stick out.

Stay Tuned for More!